An affiliate of Sunland Construction, Inc., Foremost Pipeline Construction operates from strategic locations in the Carolinas and provides service throughout the Southeastern United States. With more than 50 years of experience, Foremost brings Sunland the ability to offer complete underground distribution, joint trenching, directional drilling, underground electrical maintenance, duct banks and mainline construction services covering a wide range of projects.

Foremost has extensive expertise in gas transmission, gas distribution and municipalities and has developed highly-trained crews with the hands-on skill and know-how to perform these specialized services efficiently, effectively and safely.

FOREMOST OFFERS SERVICES INCLUDING:

  • Distribution construction; new construction and replacing bare steel mainlines
  • Joint trenching; simultaneous installation of gas, electric and cable TV
  • Auger bore and directional bore; pipe ramming
  • Installation of steel mainlines
  • Installation of water mains; both PVC and ductile iron
  • Complete pipeline integrity services
  • Underground electrical maintenance
  • Gas line bridge crossing maintenance; clean and paint or wrap
  • Installation of anodes and anode beds
  • Right-of-way maintenance
  • In-house concrete and asphalt repair crews
  • Can install any size and type HDPE/poly pipe
  • Duct bank installation

OUR EXPERIENCE INCLUDES:

  • Installation of over 2,500 service connections per year
  • Installation of over 25 miles of distribution mains per year; both steel and HDPE/poly pipe
  • Installation of over 3,500 electric service connections per year
  • Installation of up to 54" HDPE/poly pipe
  • 150 miles of right-of-way maintenance
  • Installation of steel gas transmission mains
  • Experience in Virginia, North and South Carolina, Georgia and Florida